logo

WELCOME TO

WELCOME TO

Hengshui qixing electric technology CO.,LTD.

Hengshui qixing electric technology CO.,LTD.

We are specialized in the design, overhaul, transformation, production and installation of air preheater and gas-gas heater (GGH).With the help of many customers and scientific experts, we have made some achievements. For the air leakage treatment of the air preheater, we have developed the flexible contact and the warehouse double sealing device one after another, achieving good results in many power plants. The mature and stable enamel production technology prevents the shedding and corrosion of enamel during the operation. In this field, we have more than ten years of production and research history. Besides, the scientific and reasonable design of soot blowing system increases the soot blowing effect, reduce the damage to thermoelements to ensure the normal operation of the unit. We have rich transforming experience and a solid technical team in the design and installation of the soot blowing system, the manufacture of the enamel heat exchanger components, the waveform design, the body maintenance and the DCS control system.

这是描述信息
  • 2003

    /years

    The company was founded in 2003

  • 9090

    /㎡

    Company area

  • 6109

    million yuan

    Total assets of the company

  • 11000

    ton

    Annual production capacity

Air preheater /GGH

Air preheater /GGH

QiXing Electric Power provides the electric power market with the whole set of qualified air preheater and GGH. We have experience of many years of and advanced technology on pressure type shearing of heat exchanger components, enamel coating process and enamel firing process, which have always been appraised by our customers.

Usage maintenance

Usage maintenance

Airpreheaterheattransfercomponents,installation,use,maintenanceinstructions Hoistingcomponents:Qixingpowersupplyheatexchangercomponentsaregenerallytwokindsofmaterials,oneforthelow-carbonsteelheatexchangercomponents,componentthicknessbetween0.5~0.6mm,usedinthehotend;theotherfortheenamelheatexchangercomponentscoatedAfterthethicknessof1.15~1.2mm,usedinthecoldside.Becausetheheattransfercomponentsarerolledbythesheet,inthetransport,liftingtheendofthecomponentmustbeavoideddamage,otherwise,willcausethedeformationofcomponents,enamelsheddingandotherissues,thegeneralFoundationwillprovideadedicatedspreader,Tolifttheheattransferelementcartridge.Prohibitedtheuseofordinarycarbonsteelspreadermade!.Duetofatigueresistanceofcarbonsteelispoor,pronetodecoupling,fracture,etc.,willcauseagreatsecurityaccident! HeattransfercomponentsTransportationStorage:Heattransfercomponentsintheloadingandtransportationprocessmustbeputneatlycode,andtietheprotectiverope,coveredwithraincloth,beforeunloadingthecar,therainandraintoshaketothecar,forbiddenshakingscatteredonthecomponents.Thesiteoftheheatexchangecomponentsmustbefreeofwater,debris,andotherplacesthanthecementplains,andwitharainclothtoprotect,prohibitloadingandunloadingintherainydayheatexchangercomponents,otherwiseitwillcausecorrosion. Heatexchangerinstallationprotection:Intheinstallation,avoidtouchingthesteelcolumn,electrichoisthook,guidechainandothermetalobjectsinthehoistinggrid,acertainsupporttocheckthesolidsteel,andcleanupweldingslag,scrapandotherdebris,Whenthecomponentstransferredtothegrid,onebyoneplacedasbestosblanket,theendofthecomponentstobeprotectedtopreventthenextinstallationprocessdamagetothecomponents! ComponentfoulingCorrosioncontrol:Theactualcombustionoftheboileralmostallthefuelcontainssulfur,theboilercombustionprocesswillbe2to6%ofthesulfurdioxideintosulfurtrioxide,andfluegasinthewaterreaction,denitrificationammoniaescapereactionofammoniasulfateformation,Inthecold-sideheattransferelementsurfacewillformastickywetcorrosive,inadditiontothefluegasinthefluegasandcatalystintheprocessofblowingtheparticles,fragmentsandotherdamage,andthuscontinuetocorrosionheatexchangercomponents,pluggingHeattransferchannel,resultinginpoorheattransferheatexchangercomponents,shortlife,largepressureandotherissues.SO2/SO3conversionisnotmorethan1%(molarratio);toavoidtheairpreheaterinthecontroloftherateoftheescapeofammoniainthegeneralcontrolof2.3mg/m3;The"coldjunctiontemperature"(fluegasoutlettemperature+airinlettemperature)isbelowtherecommendedminimumvalueforlongperiodsofoperation.Avoidingwaterleakagefromtheeconomizerorheaterfailureincreasesthedewpointofthefluegas,Roadleakageshouldbepromptlyrepaired. Firepreventionmeasures:Intheignition,low-loadoperation,poorcombustionconditions,theincompletecombustionofcoal,andignitionoilparcelswillappearsecondarycombustion,andthusmustpreventthesurfaceofthefuelelementoftheheattransferelementdeposition,otherwiseitwillcauseairpre-Firesituation.Theairpreheaterrotormustbekeptrotating;keepblowingsootregularlytoensurethattheheatexchangersurfaceclean;paycloseattentiontotheairpreheaterandairtemperature,whenthetemperatureanomaliesoccur,Shouldbepromptlyinvestigatedandeliminated;intheeventofsecondaryignition,mustkeeptheblower,induceddraftfan,sootblower,lowpressurewaterinanormalstate;firemonitoringsystemshouldbemaintainedinnormalworkingcondition. Checkbeforeandafterrunning:1,checkandthoroughlycleantheupperpartoftheairpre-heater,theflueinsidethetemporarypedal,scrap,support,etc.;2,checkthesootblowerbarrelbracketweldingissolid,reliable,ifnecessary,tostrengthenmeasurestopreventsootstentoffstuckrotor;3,usingthehandleplaterotor2lapstoseewhetherthefreerotation;4,checkthehigh-pressurewater,steampipes,valvesarenormal,soakedsteampipedrainageisnormal,sootvalvebeforethepressureandsuperheatisnormal;5,checktheradial,circumferential,axialsealinggap,sealingplateboltsarenormal;6,checktherotortopandbottombearings,gearboxoillubricationoilleveltomeettherequirements;7,checktheairpreheaterimportandexportbafflehasbeenclosed;8,checkthefiremonitoringdevice,checkthelocalcabinettoensureitsnormalwork;9,checktoensurethattherotorstallalarmdeviceisworkingproperly;10,checktheairpreheaterreducer,upperandlowerbearingrunningsoundisnormal;11,checkthedrivemotorcurrentisnormal;12,checktheairpreheaterair,smokeimportandexportoftemperatureisnormal. Heatexchangeelementsoot-blowing:1,theairpreheaternormaloperationafterblowingonceevery8hours,andinstrictaccordancewiththesootblowerinstructionsthatensurethattheairpreheaterresistancetomaintaintheoperatingvaluewithinthedesignvalue,beforetheshutdown,intheboilerstartupprocessandSootblowingmustbeintensifiedduringthelowloadstage.2,inordertoavoidcondensationonthesurfaceoftheheatexchangeelement,thesteamshouldbesoothedwhenthetemperatureoftheheatexchangeelementishigh,sothesootblowingshouldbeselectedundertheconditionthattheunitreachesacertainload.3,inordertoensurethatthesootblowingeffect,topreventalltheexternalwaterintotheairpreheater,payattentiontotheselectionofacertainpressureandtemperatu

| News -- Learn new information about the company

Safety

Safety manual interpretation training

November 5, 2015 the company conducted the first staff of the "Safety Management Manual" training to explain, mainly from the following interpretation: 1, the safety training knowledge; 2, the common use of tools and protection; 3, the work of the Safe and wearable; 4, the location of fire equipment storage and safe use of methods and fire safety requirements; 5, equipment safety operating rules; 6, safe use of electricity requirements; 7, safety management reward and punishment methods; 8, after the accident handling, Process, 9, first aid common sense; 10, the work of dangerous source identification.
2020-02-21
Forklift

Forklift safe use of training activities

July 15, 2016 in the company office on the first floor of a safe use of forklift training, the main training content is to understand the basic technical parameters of forklifts, the use of precaution
2020-02-21
The

The company held a long security training activities

June 21, organized by the company's production safety training activities smoothly in the second floor conference room. Participate in the activities of the main production Gang Kong long, responsible
2020-02-21
The

The first-line female employees safety training activities

August 5, according to the practical needs of the production work, the company on the front line of new women workers to carry out the popularization of safety knowledge training to explain, especiall
2020-02-21

Service hotline

0318-2668802

E-mail:zhongnengjiye@163.com  Add:North Industrial Park, Hengshui City, Hebei Province

Hengshui Qixing Electric Technology Co., Ltd  冀ICP备08004088号-1   Powerded by 300.cn 

这是描述信息

WeChat